Add cost
You can also enter cost information in the active work view.
The maximum entry is 9 digits with two decimals.
1. Select
Wages
and the text
Hourly wage:
appears.
2. Key in the wage.
3. Confirm the value with
OK
.
The entered data can be viewed on the display:
©2000 Nokia Mobile Phones. All rights reserved.
Men
u
func
ti
ons
102
•
Hours
for showing the duration of the current entry up to that specific moment
•
Rate
for showing the hourly wage
•
Total
for showing the current summary of wages
By selecting
Material
you can add material costs to total costs.
1. Enter a name or other identification of the part in question after
Material id:
and press
OK
.
2. Give the amount of used parts.
3. Key in the price of one piece after
Price:
and press
OK
.
The following information is displayed:
•
Amount
•
Cost
•
Total